Water management is a hot topic in Texas these days and to meet the ongoing demands that plays out all over the United States, Phase 1 has completed another Salt Water Disposal facility design for Breakthrough Enginuity. A 45Kbbl facility design was completed in late July which included a 3D model of the entire facility including mechanical piping, tanks, pumps, auxiliary structures and supporting structural steel components. Phase 1 included a database of the complete bill of material for the client to expedite procurement and delivery of long lead items. With this facilty the experience of Phase 1 in designing Salt Water Facilities now exceed over 50 different installations throughout the states.